    another question - in Lesson 5, 5.2 at about time 00:46 the forward traceability arrow, goes from high level (requirements) to low level (requirements). In the slide immediately following this 1, the arrow head points in the opposite direction. Kindly state what the direction should be
     
    #1
  2. Ankit Joshi_2

    Ankit Joshi_2 Well-Known Member
    Simplilearn Support Alumni

    Joined:
    Aug 24, 2016
    Messages:
    81
    Likes Received:
    5
    H,

    PFB the image of the same which will clear your doubt on the question
     
    #2
  3. Ankit Joshi_2

    Ankit Joshi_2 Well-Known Member
    Simplilearn Support Alumni

    Joined:
    Aug 24, 2016
    Messages:
    81
    Likes Received:
    5
    Image
     

    Attached Files:

    #3
  4. _5244

    _5244 Member

    Joined:
    Mar 7, 2017
    Messages:
    3
    Likes Received:
    0
    Hi, I am only see the word image and it is not hyperlinked
     
    #4
  5. Priyamwada

    Priyamwada Well-Known Member
    Simplilearn Support

    Joined:
    Dec 10, 2015
    Messages:
    757
    Likes Received:
    91
    Hi,

    The arrows are mentioned in the image shared by Ankit.
    Suggest you to go through the same.

    Happy Learning!!
    Priyamwada Singh - Global Teaching Assistant
     