    Does the Value Based Prioritization should be in the below order?

    High Risk High Value
    Low Risk High Value
    High Risk Low Value > Should be done at last
    Low Risk Low Value > Shouldn't be picked up.

    Can you please clarify?

    Thanks
    Kani
     
    #1
  2. Karthik eyan(1039)

    Karthik eyan(1039) Moderator
    Alumni

    Joined:
    Dec 30, 2011
    Messages:
    10
    Likes Received:
    3
    High Value High Risk
    High Value Low Risk
    Low Value Low risk
    Low Value High risk

    This is the sequence
     